

- Description
- A large telescope
- Source
- NASA (Transfered by Quantanew/Original uploaded by Mohamed Osama AlNagdy · original page
- Licence
- PD Public domain
Matrix: Advanced analytics
How the product supports advanced analytics (prediction, anomaly detection, recommendation): scoping, data, experimentation, validation, production release, monitoring, accountability, integration.
In brief
- 8 dimensions, levels 0 to 5, 112 criteria.
- Tool: run an assessment by choosing "Advanced analytics".
- Levels and criteria: original synthesis, references cited at the bottom of the page.
The analytical capabilities beyond reporting built into the product: forecasts, anomaly detection, classification, recommendations, assistants. Scoping of use cases, data preparation, experimentation, validation, industrialization of models, monitoring, explanation and responsible use, integration into decision-making. Descriptive reporting belongs to the "Reporting" theme.
8 dimensions, six levels (0 to 5) and 112 observable criteria. To place your product: open the assessment for this theme. The scoring rules are here.
Overview#
Each cell is the level's signature for the dimension.
| Dimension | 0 · Handcrafted | 1 · Locally tooled | 2 · Shared | 3 · Industrialized | 4 · Integrated and governed | 5 · Autonomous |
|---|---|---|---|---|---|---|
| Use case scoping | Analyses launched out of curiosity or because of a trend. | Ideas noted. | Use cases described. | Use cases prioritized. | Value tracked. | Portfolio steered. |
| Preparation of analysis data | Data extracted and cleaned by hand for each trial. | Datasets frozen. | Preparation scripted. | Features managed. | Preparation controlled. | Features shared. |
| Experimentation and reproducibility | Trials in personal notebooks, with no record of parameters. | Trials kept. | Trials tracked. | Reproducible environments. | Training automated. | Experimentation industrialized. |
| Validation and performance measurement | A model is judged good because the result looks plausible. | Simple measurement. | Structured validation. | Independent validation. | Validation in real conditions. | Continuous validation. |
| Industrialization of models | The model is a file sent by hand, used by its author. | Model handed to the application team. | Reproducible training. | Automated deployment. | Automated operation. | Full lifecycle. |
| Monitoring and drift | A model is assumed good as long as nobody complains. | Manual monitoring. | Regular monitoring. | Drift detected. | Response organized. | Automatic response. |
| Explainability and responsible use | The model is a black box used unconditionally. | Operation described. | Results explained. | Use framed. | Fairness examined. | Accountability verified. |
| Integration into decision-making | Results stay in study documents. | Results communicated. | Results in the reports. | Results in the process. | Feedback loop. | Assisted decision-making. |
Dimensions of the overall model that are most relevant: Usage (level 5, assisted experience), Business processes and Industrialization and deployment. For analytics at the organization level, see the TDWI matrix.
Scoping and preparation#
Use case scoping#
Are advanced analyses chosen on the basis of expected value and feasibility?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Analyses launched out of curiosity or because of a trend. | Starting point: no criteria. |
| 1 · Locally tooled | Ideas noted. |
|
| 2 · Shared | Use cases described. |
|
| 3 · Industrialized | Use cases prioritized. |
|
| 4 · Integrated and governed | Value tracked. |
|
| 5 · Autonomous | Portfolio steered. |
|
The product carries only analyses whose contribution is known and whose success can be recognized.
Preparation of analysis data#
Is the data used by models prepared, versioned and reproducible?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Data extracted and cleaned by hand for each trial. | Starting point: no criteria. |
| 1 · Locally tooled | Datasets frozen. |
|
| 2 · Shared | Preparation scripted. |
|
| 3 · Industrialized | Features managed. |
|
| 4 · Integrated and governed | Preparation controlled. |
|
| 5 · Autonomous | Features shared. |
|
It is known what data a model was built with, and that data can be rebuilt identically.
Experimentation and reproducibility#
Are trials tracked, comparable and reproducible?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Trials in personal notebooks, with no record of parameters. | Starting point: no criteria. |
| 1 · Locally tooled | Trials kept. |
|
| 2 · Shared | Trials tracked. |
|
| 3 · Industrialized | Reproducible environments. |
|
| 4 · Integrated and governed | Training automated. |
|
| 5 · Autonomous | Experimentation industrialized. |
|
A result can be redone, and the best model is chosen on facts, not on someone's memory.
Validation and production release#
Validation and performance measurement#
Is it known how to measure that a model is good, and for whom?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | A model is judged good because the result looks plausible. | Starting point: no criteria. |
| 1 · Locally tooled | Simple measurement. |
|
| 2 · Shared | Structured validation. |
|
| 3 · Industrialized | Independent validation. |
|
| 4 · Integrated and governed | Validation in real conditions. |
|
| 5 · Autonomous | Continuous validation. |
|
It is possible to say how reliably the model gets things wrong, and in which cases it should not be trusted.
Industrialization of models#
Does a trial become a model that is operated reliably, versioned and automated?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | The model is a file sent by hand, used by its author. | Starting point: no criteria. |
| 1 · Locally tooled | Model handed to the application team. |
|
| 2 · Shared | Reproducible training. |
|
| 3 · Industrialized | Automated deployment. |
|
| 4 · Integrated and governed | Automated operation. |
|
| 5 · Autonomous | Full lifecycle. |
|
A model in production is a component like any other: versioned, tested, deployed and supervised.
Monitoring and drift#
Does a model in production remain good when the data changes?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | A model is assumed good as long as nobody complains. | Starting point: no criteria. |
| 1 · Locally tooled | Manual monitoring. |
|
| 2 · Shared | Regular monitoring. |
|
| 3 · Industrialized | Drift detected. |
|
| 4 · Integrated and governed | Response organized. |
|
| 5 · Autonomous | Automatic response. |
|
A model that degrades is detected and dealt with before it distorts decisions.
Trust and decision-making#
Explainability and responsible use#
Can a result be explained, and is the use of the model framed?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | The model is a black box used unconditionally. | Starting point: no criteria. |
| 1 · Locally tooled | Operation described. |
|
| 2 · Shared | Results explained. |
|
| 3 · Industrialized | Use framed. |
|
| 4 · Integrated and governed | Fairness examined. |
|
| 5 · Autonomous | Accountability verified. |
|
The user understands why the model suggests something, and knows when not to follow it.
Integration into decision-making#
Do advanced results reach the point of decision, and are they used?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Results stay in study documents. | Starting point: no criteria. |
| 1 · Locally tooled | Results communicated. |
|
| 2 · Shared | Results in the reports. |
|
| 3 · Industrialized | Results in the process. |
|
| 4 · Integrated and governed | Feedback loop. |
|
| 5 · Autonomous | Assisted decision-making. |
|
A forecast or an alert really changes a decision; otherwise it is not worth its cost.
The dimensions are inspired by the references cited below; the levels and criteria are an original synthesis, not a reproduction of a framework. They are offered for discussion and adaptation, not as authoritative.
Sources and verification#
- Microsoft Learn — MLOps Maturity Model (Azure Architecture Center) — five levels: no MLOps, DevOps but no MLOps, automated training, automated model deployment, fully automated operations; a level 4 where drift triggers retraining
- dbt — Add data tests to your DAG — automatic data tests on inputs
- Microsoft Learn — Fabric adoption roadmap: maturity levels — advanced analytics within the adoption path
- GDPR, Article 5(1)(c) and (e) — text on the CNIL website (in French) — data minimization and storage limitation, applicable to training data