clement13.net
Original photo: Des rangées de sièges de bois vides dans une salle d'attente de gare.
Description
Des rangées de sièges de bois vides dans une salle d'attente de gare.
Source
須田拓樹 · original page
Licence
CC0 Public domain
Original photo, unretouched. The background is a version of it stylised by the site.

The contrast effect

After a brilliant candidate, the next one seems mediocre; after a weak candidate, the same one seems excellent.

Effect≈ 10 min readCheckedCheck doneFacts, figures and references were checked against the sources cited in the page.Written with AI assistance; sources are cited at the bottom of the page. An error? Report it via clement13.net.Reading
FrequencyFrequentSeveral times per project.
Where you meet it
  • Successive interviews
  • Application screening
  • Code reviews
  • Comparing offers
  • Annual evaluation
  • Team rating
AI helpGoodA real gain, with safeguards. See how ↓
In brief
  • What: the perceived value of something depends on what it is compared to right before; the same thing seems better or worse depending on what sits next to it.
  • Why: the mind judges by differences, not absolute values; the last example becomes the reference point.
  • Detect: ratings that vary with order, a “not as good as the previous one” in comments.
  • Avoid: a rubric set in advance, score each candidate or deliverable on its own, mix the order, space out evaluations.
On this page

Definition#

Avatar of Daniel KahnemanIllustration inspired by the person
Daniel KahnemanIsraeli-AmericanMarch 5, 1934 – March 27, 2024Tel Aviv → Nunningen (Switzerland)Psychologist, 2002 Nobel laureate in economics
Avatar of Amos TverskyFictitious illustration
Amos TverskyIsraeliMarch 16, 1937 – June 2, 1996Haifa → Stanford (United States)Cognitive and mathematical psychologist

The contrast effect is the amplification of perceived differences between two items examined one after the other (or side by side): after a high-level stimulus, an average stimulus is judged lower; after a weak stimulus, it is judged higher. Perception is relative: we do not evaluate a thing, we evaluate it in relation to the previous one.

The phenomenon is old and general: a bucket of lukewarm water feels warm after ice and cold after scalding water, and psychophysics experiments have shown this with lifted weights (Sherif et al., 1958). In social psychology, Douglas Kenrick and Sara Gutierres (1980) demonstrated it in attractiveness judgments: students who had just watched a TV show featuring very attractive women judged a photo of an average-looking woman as less attractive, compared with students who had watched another program.

It is close to Anchoring, where the reference is a number, and to The framing effect, where it is wording. Here, it is the previous item that serves as the reference.

How it works#

  • A relative judgment. The brain has no absolute scale for most qualities (competence, charm, price, difficulty): it compares with what is available in immediate memory.
  • The latest item is the reference. The last example seen occupies working memory; it becomes the implicit yardstick for the next item.
  • A shifting scale. After several weak items, the “normal” shifts downward; the same submission then looks good, and a decent submission looks excellent. The opposite happens after several excellent items.
  • A need to spread out. When rating several items in sequence, we tend to spread ratings across the whole scale, even if items are close: we exaggerate gaps.
An average-levelcandidateComes aftera brilliantcandidateSeemsdisappointingComes aftera weakcandidateSeemsexcellentCriteria rubricset in advanceratings before comparisoncommon yardstick
The same candidate (average “true” rating) appears after two different situations. The rubric set in advance serves as a common reference: it replaces the previous item as the yardstick.Hover over or tap an element to read its details.
Interview order, evidence from admissions interviews

Uri Simonsohn and Francesca Gino (2013) studied ten years of admissions interviews in an MBA program (more than 9,000 interviews). Interviews on the same day were conducted one after another: a candidate had lower odds of being rated favorably if they came right after strong candidates, and higher odds if they came after weaker ones, even though nothing indicated that order was tied to quality. The authors describe narrow “bracketing”: each day is treated as a small set to balance. They consider perceptual contrast unlikely as the explanation; the example therefore mostly illustrates how judgment depends on what comes before, adjacent to the contrast effect.

Same candidate, two judgments (illustrative)

View the data
After a brilliant oneRated aloneAfter a weak one
After a brilliant candidate2.5--
Rated alone (rubric)-3-
After a weak candidate--3.5
Illustration, not measured data: an average-level candidate (3 out of 5 on a rubric) gets a lower rating after a brilliant candidate and a higher rating after a weak one. The 0.5-point gap is chosen for readability.

Where you encounter it#

In project management#

  • Offer comparison: three vendor offers; one is clearly too expensive, making the other two look “reasonable” (see also Anchoring). The order in which proposal files are read changes ratings.
  • Code review: after a catastrophic merge request, an “average” request looks clean; after exemplary work, the same one looks sloppy.
  • Estimating: a 5-day task looks small if it follows a 40-day task; it looks large after a 0.5-day task. Planning poker without a stable reference suffers from this.
  • Defects: a medium-severity defect is classified as “minor” after a major incident in the same review session, “major” after a string of minor details.
  • Demos and acceptance testing: a successful demo right after a failed demo is judged better than it is.

In management#

  • Back-to-back hiring interviews: the candidate after a very weak candidate is judged brilliant, and a good candidate following a star is judged average.
  • Application screening: after twenty weak resumes, a decent resume looks remarkable; the reverse after a stack of exceptional profiles.
  • Evaluation calibration: a solid employee, evaluated right after the best member of the team, gets a harsher rating. A manager with a strong team rates more harshly than one with a weaker team.
  • Promotion or internal hiring: the external candidate, compared with the last employee who left, seems better or worse depending on how that person is remembered.
  • Raise announcements: a 3% raise seems generous when announced after a frozen year, and stingy after a year of bonuses.

Famous cases#

Field study

Ten years of admissions interviews: order of appearance 2013#

Bias at play: contrast effect (and narrow decision “bracketing”).

10 yearsof MBA admissions interview data
9,000+interviews analyzed (order of magnitude)
2013publication, Psychological Science

What happened. Simonsohn and Gino used interviews from a U.S. MBA program: interviewers see several candidates in one day and assign each an evaluation score. The authors show that a candidate's evaluation is negatively linked to the evaluations of previous candidates from the same day, but not to candidates from previous days: as if each day had an implicit quota of “good” candidates. A good candidate is therefore followed by a more harshly judged candidate. This pattern looks like contrast, but the authors attribute it instead to narrow “bracketing”: their additional analyses rule out perceptual contrast and non-random interview order as explanations.

What this illustrates

If interview order influences ratings, selection depends on who came before, not only on candidate quality. In a company, this is true for all serial evaluation processes: interviews, defenses, demos, code reviews in the same session. Evaluate each item against the rubric, not against the previous one, and vary the order.

Controversial study

Parole decisions: nuance required 2011-2016#

Bias at play: successive decisions (possible contrast); attribution to fatigue and contrast is debated.

1,112parole decisions studied
8Israeli judges
~65%favorable decisions at the start of session (graph reading)

What happened. In 2011, Shai Danziger, Jonathan Levav, and Liora Avnaim-Pesso published a widely cited study in PNAS: across about 1,100 parole decisions made by eight judges, the share of favorable decisions seemed to drop almost to zero at the end of each session, then rise again after a break. The paper was read as an example of decision fatigue, and sometimes also as an illustration of biases linking successive decisions (we “balance” our decisions).

What was challenged. As early as 2011, Keren Weinshall-Margel and John Shapard replied that cases were not presented randomly: unrepresented inmates, whose requests were accepted less often, frequently appeared at the end of sessions. In 2016, Andreas Glöckner showed by simulation that the magnitude of the effect is largely overestimated once case order linked to severity is taken into account. The exact phenomenon (fatigue, contrast, case order) is therefore not established.

What this illustrates

This famous study should be handled carefully: it illustrates a legitimate question, not proof. For a manager, the lesson is twofold: case order can distort successive decisions, but a spectacular statistic with a single-cause explanation must be verified before being repeated in training.

Detection signals#

  • “He is much worse than the previous one”: an evaluation phrased relative to someone else.
  • Ratings in the same session spread out across the full scale, even though the work is similar.
  • A candidate's rating changes depending on the order in which files are reread.
  • After an exceptional case, all following ones seem “okay” or “disappointing” without the rubric being reviewed.
  • An estimate or quote seems “reasonable” only because another, more expensive one, was seen right before.
  • A strong team judges newcomers more harshly than an average team would.

Avoidance reflexes#

  1. Set the rubric before seeing anything. Written criteria, levels, and examples: each item is judged against the rubric.
  2. Rate each item on its own, immediately. Write down a candidate's rating and facts before moving to the next one, without revisiting previous ratings.
  3. Change the order. When possible, vary the order in which files are reviewed or the order people go through; in a committee, rotate evaluators.
  4. Space things out. Avoid a burst of interviews or reviews without breaks; spacing makes it easier to return to the rubric.
  5. Use absolute references. A scale anchored in behaviors (“delivered a full work package end-to-end independently”), level examples, rating history.
  6. Evaluate first, compare afterward. Comparing candidates has its place, but after individual ratings; it decides, it does not rate.
  7. Be wary of the “best in the batch.” An item that dominates a weak batch is not necessarily good; check it against the rubric.
  8. Use blind rating. Have multiple evaluators review separately, in different orders, then compare ratings.

With AI: detect, fix, mitigate#

Estimated AI assistance: partial

AI has a valuable advantage: it can evaluate each item in isolation, in a fresh context, against a rubric. But, like humans, a model's judgment is influenced by what came before in the same conversation (sequential biases in language models are documented, for example by Echterhoff et al., 2024): a batch evaluated in one uninterrupted run is also likely to be contrasted. Open a fresh session for each item.

Detect#

  • Compare ratings to the order of appearance in a series of interviews or reviews to spot drift.
  • Identify, in comments, relative judgments (“better than,” “worse than”) without criteria.
  • Measure the spread of ratings in a session against the actual dispersion of profiles.

Fix#

  • Evaluate each file in isolation, against the rubric, in a separate session.
  • Turn a vague rubric into an anchored scale: levels described with behaviors and examples.
  • Produce an independent rating to compare with evaluators' ratings.

Mitigate#

  • Have files randomly reordered before rereview.
  • Have resumes or deliverables anonymized before evaluation.
  • Request a second evaluation in reverse order and compare gaps.

Prompts to integrate into your practices#

1. Isolated evaluation against a rubric. A fresh session per candidate or per deliverable; the rubric is provided before the item.

Here is an evaluation rubric: [criteria, levels, and behavior examples].
Evaluate the item below <strong>only</strong> against this rubric. You must not compare this item to any other item, or to any assumed average.
For each criterion: the rating, the specific facts from the document that justify it, and what is missing to assess it. If information is missing, do not assume it.

Item: [anonymized resume / review / deliverable]

2. Detect an order effect. After a series of interviews or reviews, using anonymized data.

Here are ratings in order of appearance, with criteria and associated comments: [table].
1. Calculate, for each item, the previous rating and the gap.
2. Indicate whether ratings seem more tied to the previous item's rating than to the facts cited in the comments.
3. Quote comments that judge by comparison (“better than,” “worse than”).
4. State what you can assert from this data and what requires more evidence (sample size, non-random order).

How to integrate them#

  • Before the session: set the rubric, optionally with AI help to anchor it with examples.
  • During: each evaluator rates alone, before seeing others' ratings; AI provides an independent rating via prompt 1.
  • After: prompt 2 is used for process review, not to judge evaluators.

Precautions#

  • Resumes and evaluations are personal data: anonymize and use only an approved tool; automated candidate evaluation is regulated by law.
  • Never evaluate two candidates back-to-back in the same conversation.
  • AI reproduces biases from its data (name, gender, school): it does not replace a reasoned human decision.
  • It may cite facts not present in the document: verify every justification.

Limitations#

  • Contrast is not always unfavorable: comparison is sometimes useful (choosing among three offers means comparing them). Bias starts when comparison replaces the standard.
  • The opposite effect exists: assimilation. When items are perceived as belonging to the same category, judgment moves closer to the reference instead of farther away from it (Mussweiler, 2003).
  • The order effect in successive decisions, widely discussed, is debated (see the parole case); the MBA interview study, meanwhile, is based on observed data from a single program.
  • In some contexts (competitive exams, panels), contrast is amplified by the requirement to rank, which pushes ratings apart.

Sources and verification#

See also#

Combines with, or reinforces#

These biases feed each other.

Variants or cousins: not to be confused.

What neutralises it.

  • L'évaluation critère par critère (concept or method, no page)
  • L'entretien structuré (concept or method, no page)