The Curse of Knowledge

What seems obvious to us is only obvious because we already know it, and we forget what it was like not to know.

Bias≈ 10 min readCheckedCheck doneFacts, figures and references were checked against the sources cited in the page.Written with AI assistance; sources are cited at the bottom of the page. An error? Report it via clement13.net.Reading
FrequencyUbiquitousYou meet it on almost every project or every week.
Where you meet it
  • Documentation
  • Onboarding
  • Training
  • Specifications
  • Code review
  • Support
  • Handover
AI helpStrongAI does most of the detection work. See how ↓
In short
  • What: people who know overestimate what others know and underestimate the effort required to understand.
  • Why: once knowledge is acquired, it can no longer be “unlearned” to simulate ignorance.
  • Detect: “it's obvious,” acronyms never defined, documentation only its authors understand.
  • Avoid: have a novice review it, watch someone try, explain step by step, measure rather than assume.
On this page

Definition#

Avatar of Colin CamererFictitious illustration
Colin CamererAmericanborn in 1959Behavioral economist, California Institute of Technology (Caltech)
Avatar of George LoewensteinFictitious illustration
George LoewensteinAmericandate of birth not publishedBehavioral economist, Carnegie Mellon University

The curse of knowledge (curse of knowledge) is the difficulty an informed person has reasoning from the point of view of someone who is not informed. As soon as we know something, we find it simple, assume others know it too, and forget the steps that were needed to get there.

The expression was popularized in economics by Colin Camerer, George Loewenstein, and Martin Weber (1989): in a market experiment, agents informed about a company's future results were unable to ignore that information to guess what uninformed agents would estimate. In developmental and cognitive psychology, the same phenomenon appears in adults (Birch and Bloom, 2007). It is close to the illusion of transparency, but it concerns knowledge rather than emotions.

It is neither bad faith nor arrogance: it is a mechanical effect, and it hits harder the more competent you are.

The mechanism#

  • Knowledge cannot be put on pause. To imagine a novice's state of mind, we start from our own and try to correct it. As with anchoring, the correction is insufficient.
  • Knowledge becomes invisible. The older and more automated a skill is, the less we remember it was learned: experts “compress” steps (chunking) and no longer see what used to be hard.
  • We judge difficulty from the outside based on the outcome. A reader looking at a document they already understand finds it clear; they might have found it obscure before.
  • Feedback signals are missing. People who do not understand do not always dare say so, especially in front of an expert or a superior; the expert takes silence as understanding.
The expertknows the context,the vocabulary, theintermediate stepsThey write orexplain usingwhat they knowJumps, acronyms,and prerequisitesremain implicitThe novicedoesn't understand,doesn't dare askThe expert takessilence asagreementSafeguardsreview by a noviceusability testcomplete examplesask them to rephrasebeforeduring
The same text is clear to its author and opaque to its reader, because the missing knowledge is precisely what the author can no longer see. The safeguards involve bringing in an outside perspective before publication.Hover over or tap an element to read its details.

The “tappers” and “listeners” experiment#

Tap a tune, have it guessed

In 1990, in her psychology dissertation at Stanford, Elizabeth Newton gave “tappers” a list of very well-known tunes (national anthem, popular songs). Each person chose a tune and tapped it with a finger on a table; a “listener” had to identify it. Before the trial, the tappers estimated the listener would get it right about one time out of two. Result: listeners identified only 3 tunes out of 120, or 2.5%. The tapper “hears” the melody in their head; the listener hears only taps.

Tappers and listeners (Newton, 1990)

View the data
ForecastResult
Predicted by tappers50-
Observed-2.5
Average prediction by tappers and observed result on 120 tunes, based on Chip and Dan Heath's (2007) account of Elizabeth Newton's dissertation (Stanford, 1990).

Where we encounter it#

In project management#

  • Documentation and README: “run the build script” without saying where, with which version, or with which permissions. The author has done these steps a hundred times and no longer sees them.
  • Onboarding: the veteran explains the architecture in twenty minutes, with internal acronyms, then concludes “any questions?” The newcomer manages to say “no” out of embarrassment.
  • Specifications and tickets: “handle the usual case,” “as usual.” The developer discovering the topic has to guess what “usual” means.
  • Error messages and interfaces: “Error 4021” speaks to the team that wrote the code, not to the user.
  • Estimation: the expert estimates how long a novice will need to learn a tool based on their own time. Hinds (1999) observed that experts underestimated the time novices needed to use a device, and that their confidence in their predictions was high.
  • Code review: the reviewer who knows the module finds the code “readable”; the next one, who does not know it, spends a whole day on it.

In management#

  • Instructions and delegation: “can you handle this?”, without context, success criteria, or deadline, because all that is obvious to the manager.
  • Feedback: “be more strategic,” “more leadership”: the manager knows what they mean, the employee does not know what to change.
  • Training and support: an expert who became a trainer skips steps; trainees nod and tune out.
  • Change announcements: leadership has spent months thinking through the reorganization; it is announced in ten minutes as if the reasoning were self-evident.
  • Handover: the person leaving writes a three-line note about a role they know by heart.

Famous cases#

Study

The Stanford tappers 1990#

Biases at play: curse of knowledge, illusion of transparency.

120tunes tapped on a table
~50 %success rate predicted by tappers
3 sur 120tunes recognized (2.5%)

What happened. In the experiment described above, psychologist Elizabeth Newton had volunteers tap familiar tunes and asked listeners to identify them. The gap between what tappers predicted and what happened was huge: about 50% expected, 2.5% observed. The experiment became widely known through the Heath brothers' book Made to Stick (2007).

What this illustrates

The tappers are neither foolish nor careless: they simply can no longer “switch off” the tune they hear in their head. Your document or presentation has the same status: you hear the melody, the reader hears only taps. The only way to know what gets through is to test with someone who does not know.

Study

When the expert predicts the novice's time 1999#

Biases at play: curse of expertise, underestimation of learning effort.

Pamela Hinds asked participants with different experience levels to predict how long beginners would take to complete a task using a common electronic device. The most experienced people underestimated the required time and were nevertheless confident in their prediction; the study also tested methods to correct this bias, with limited effectiveness. (Only the general direction is reported here; see the article for the numbers.)

What this illustrates

Expertise improves command of a topic and worsens prediction of someone else's effort. In projects, this explains onboarding and training estimates that are always too short. Have ramp-up time estimated by someone who went through it recently, not by the expert.

Cas de terrain

Markets where you can no longer “forget” 1989#

Biases at play: curse of knowledge in economics.

In experiments by Camerer, Loewenstein, and Weber, published in the Journal of Political Economy, participants receive private information about a company's value, then must predict what other participants who do not have that information will think. Informed participants struggle to ignore what they know: their predictions of what uninformed participants will think remain pulled toward the information they hold.

What this illustrates

The phenomenon is not limited to teaching: it affects negotiation, pricing, and any situation where one party knows more than the other. What you know changes your perception of what others know, and you cannot choose otherwise.

Detection signals#

  • The words “obvious,” “trivial,” “of course,” “as everyone knows.”
  • Documentation that only its authors understand, or that no one dares criticize.
  • Acronyms, code names, and internal abbreviations that are never defined.
  • New hires always ask the same questions, or ask none at all.
  • “But we explained it!” after a misunderstanding.
  • Onboarding announced as one week that ends up taking two months.

Avoidance reflexes#

  1. Have a novice review it. A document is finished only when someone unfamiliar with the topic can use it on their own. Watch them without helping.
  2. Test instead of asking “is that clear?” Ask them to rephrase, repeat the step, or say what they would do first. A “yes” proves nothing.
  3. Define before using. Every acronym is defined on first use; include a glossary and an overall diagram at the start of the document.
  4. Explain the why, not just the what. Context, objective, and success criteria provide what the expert thinks is obvious.
  5. Give one complete example. One concrete end-to-end case, with values, is worth ten abstract paragraphs.
  6. Track new people's questions. Every beginner question is a gap in the documentation; fix it the same day.
  7. Scale up your training estimates. For ramp-up time, start from observed time on recent arrivals.

With AI: detect, fix, mitigate#

Estimated AI help: high

This is one of the rare biases where AI is almost ideal: it can play the role of the novice reader you don't have on hand, at any hour, without fatigue or discomfort. It doesn't have access to your context unless you give it to it: that's exactly what makes it useful. Be careful, though: it sometimes fills in gaps with plausible guesses, and an “I understood” from it doesn't guarantee that a human will understand.

Detect#

  • Identify undefined acronyms, terms, and references in a document.
  • Spot logical jumps: implied steps, missing prerequisites, “you just have to.”
  • Make a list of questions a newcomer would ask while reading the text.

Fix#

  • Rewrite an explanation for a specific audience (junior developer, project manager, client).
  • Produce a glossary and a complete example from the text.
  • Turn a handoff note into a step-by-step procedure.

Mitigate#

  • Systematically submit documents to a novice AI reviewer before sharing.
  • Ask AI to ask comprehension questions about a document, then answer using only what is written.
  • Build an onboarding assistant fed by documentation: its “I don't know” responses reveal the gaps.

Prompts to integrate into your workflow#

1. Novice reviewer. Run on a document before sharing it (without confidential data).

You are [a junior developer / a new project manager / a non-technical client] discovering this topic. You have no context outside the text below.
1. List all terms, acronyms, and references you don't understand.
2. Point out every place where you're missing a step, a prerequisite, or an example to succeed on your own.
3. Write the first ten questions you would ask the author.
4. Don't fill in gaps: if information is missing, say so rather than guessing.

Text: [document]

2. Context-free comprehension test. To verify that a text stands on its own.

Here is a procedure. Using only what is written in the text, answer the questions below. For each question, indicate whether the answer appears in the text (quote the passage) or does not appear there.
Questions: [for example: what do you do first? with what permissions? what should you do if step 3 fails? how do you know it's finished?]

Text: [procedure]

How to integrate them#

  • When writing: prompt 1 serves as a first review, even before asking a colleague.
  • Before sharing: prompt 2 checks that the document is self-contained.
  • At the end: a real novice should still review it; AI doesn't replace a human reader, it comes before one.

Precautions#

  • Don't paste documents containing personal data, secrets, or client information into an unauthorized tool.
  • Specify the audience level: without that, AI assumes an average reader and misses gaps.
  • AI readily fills blanks with plausible assumptions: explicitly ask it to flag what's missing rather than guess it.
  • It has its own form of “curse”: its explanations use expert vocabulary unless you constrain it.

Limits#

  • The effect is well established, but its magnitude varies by task; correction strategies (“imagine you don't know”) have modest effectiveness, which argues for external mechanisms (review, test) rather than goodwill.
  • The tappers story is a dissertation result, shared mainly through popularization books: the order of magnitude is solid, but the details of the conditions are less well documented than in a published article.
  • Simplifying is not dumbing down: an expert audience appreciates a dense document. The goal is to adapt to the real audience, not explain everything to everyone.

Sources and verification#

See also#

Combines with, or reinforces#

These biases feed each other.

Variants or cousins: not to be confused.

What neutralises it.

  • Le test avec un lecteur novice (concept or method, no page)
  • Le canard en caoutchouc (explication à voix haute) (concept or method, no page)
  • The devil's advocate