

- Description
- A bridge
- Source
- Wilfredor · original page
- Licence
- CC0 Public domain
BI product — Trust and operations
What lets you rely on the product day to day.
Access and permissions#
Who can see and do what, and how is it managed?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | The file is copied to whoever asks for it. | Starting point: no criteria. |
| 1 · Locally tooled | Files shared in a folder or protected by a password. |
|
| 2 · Shared | Authenticated access, named accounts. |
|
| 3 · Industrialized | Groups and roles, centrally managed rights. |
|
| 4 · Integrated and governed | Row-level security, inherited scopes, periodic review. |
|
| 5 · Autonomous | Policy-driven permissions: automatic granting, temporary rights, continuous audit. |
|
Effect on the user
The user sees exactly what concerns them, without asking for it or filtering it themselves.
Security and compliance#
Are the data and the product protected, and can this be demonstrated?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | No specific measures: data lives on uncontrolled workstations or disks. | Starting point: no criteria. |
| 1 · Locally tooled | Sensitive data is identified. |
|
| 2 · Shared | Basic measures: encrypted exchanges, backups, updates. |
|
| 3 · Industrialized | Security by design: requirements, reviews, penetration tests. |
|
| 4 · Integrated and governed | Compliance built into deliveries: check before each release, logged access. |
|
| 5 · Autonomous | Automated checks in the delivery pipeline, continuous monitoring. |
|
Effect on the user
The user does not need to know the security rules: the product applies them by default.
Availability and performance#
Is the product there when needed, and at what cost?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Available when the author's workstation is. | Starting point: no criteria. |
| 1 · Locally tooled | Files on a workstation or a share, with no guarantee. |
|
| 2 · Shared | Shared server, backups, announced maintenance. |
|
| 3 · Industrialized | Availability targets defined and measured, monitoring. |
|
| 4 · Integrated and governed | Sized capacity, high availability, managed costs. |
|
| 5 · Autonomous | Automatic adjustment: start, stop, scale up and down; self-healing. |
|
Effect on the user
The user never wonders whether the product will be available or fast: it is a given.
Support and observability#
Who helps when it does not work, and do we see problems coming?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | The author troubleshoots, when available. | Starting point: no criteria. |
| 1 · Locally tooled | Users know whom to contact. |
|
| 2 · Shared | Single entry point and request tracking. |
|
| 3 · Industrialized | Support process, knowledge base, classified incidents. |
|
| 4 · Integrated and governed | Observability: logs, metrics and usage telemetry put to use. |
|
| 5 · Autonomous | Predictive detection: drifts are anticipated before the incident. |
|
Effect on the user
The user is warned before suffering the problem, and always knows whom to turn to.