

- Description
- A drawing of a delta
- Source
- Pearson Scott Foresman · original page
- Licence
- PD Public domain
BI product — Data
What the product guarantees about the data it handles.
Data sources and flows#
Where does the data come from, and how does it arrive?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Files built by hand and kept locally. | Starting point: no criteria. |
| 1 · Locally tooled | Local data extracted from an ERP (or another management system). |
|
| 2 · Shared | Scheduled extraction to a common source. |
|
| 3 · Industrialized | Industrialized flows: recovery after failure, logging, volumes tracked. |
|
| 4 · Integrated and governed | Multiple sources consolidated in a common model. |
|
| 5 · Autonomous | Continuous flows and data contracts: the product adapts to changes in the sources. |
|
Effect on the user
The user no longer has to wonder whether the data is up to date, complete, or where it comes from.
Data quality#
Can the data be trusted, and how do we know?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | No checks: errors are noticed when they become visible. | Starting point: no criteria. |
| 1 · Locally tooled | Manual visual checks by the author. |
|
| 2 · Shared | Defined and documented check rules. |
|
| 3 · Industrialized | Automated checks and anomaly reports. |
|
| 4 · Integrated and governed | Quality measured by dimension, visible to users, with data owners. |
|
| 5 · Autonomous | Automatic corrections and prevention at the source. |
|
Effect on the user
The user no longer has to check the figures themselves: trust is carried by the product.
Semantic model and indicators#
Does each indicator have a single, shared and controlled definition?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Each file recalculates its own indicators. | Starting point: no criteria. |
| 1 · Locally tooled | Formulas copied from one file to another. |
|
| 2 · Shared | A shared model: common tables and relationships. |
|
| 3 · Industrialized | Indicators defined once, glossary published. |
|
| 4 · Integrated and governed | Governed semantic layer: reusable, versioned, multilingual. |
|
| 5 · Autonomous | Indicators “as code”: tested and deployed automatically. |
|
Effect on the user
The user no longer has to wonder which definition applies: one figure, one meaning.
Documentation and traceability#
Can the product be understood, used and audited without its author?
| Level | Signature | Criteria to meet |
|---|---|---|
| 0 · Handcrafted | Tacit knowledge, held by the author. | Starting point: no criteria. |
| 1 · Locally tooled | Personal notes. |
|
| 2 · Shared | Single, summary, accessible documentation. |
|
| 3 · Industrialized | Documentation updated with every version, data dictionary. |
|
| 4 · Integrated and governed | Catalog and end-to-end traceability, glossary. |
|
| 5 · Autonomous | Documentation generated automatically from the model, checked at every delivery. |
|
Effect on the user
The user finds on their own the answer to “what does this figure mean and where does it come from?”.