clement13.net
Original photo: A harvest
Description
A harvest
Source
U.S. Army Corps of Engineers · original page
Licence
PD Public domain
Original photo, unretouched. The background is a version of it stylised by the site.

BI product — Value and usage

What the product brings to those who use it.

≈ 3 min readReading

Use#

Who uses the product, how, and with what help?

LevelSignatureCriteria to meet
0 · HandcraftedDashboards built by hand in local files, used only by their author.Starting point: no criteria.
1 · Locally tooledLocal dashboards (Excel) shared by file or by email.
  • Dashboards are shared with people other than their author.
  • The indicators tracked are grouped by theme in a single dashboard.
2 · SharedCentral publication: one place, one version, identified users.
  • Dashboards are published in a single central space.
  • Users view the same up-to-date version, without receiving a file.
  • We know who views what (usage report).
3 · IndustrializedDefined path: reference reports, common navigation and filters, guided onboarding.
  • Reference reports are designated and recognized as such.
  • Navigation and filters follow common rules (template, style guide).
  • Onboarding (training, guide, demonstration) is offered to new users.
4 · Integrated and governedSupervised personalization and creation: views per user or group, creation and sharing by users.
  • A user or a group can personalize their views, filters and alerts.
  • Users can create and share their own reports from certified data.
  • User creations are visible and managed (owner, scope, lifecycle).
5 · AutonomousAssisted experience: the product suggests, alerts and guides without the user having to search.
  • The product triggers alerts or recommendations based on usage and data.
  • The user can query certified data in plain language or through an assistant.
  • Measured usage continuously feeds the improvement of the product.
Effect on the user

The user no longer needs to know where the data is or which version is the right one: they focus on the decision.

Integration#

How does the product fit into daily work and into other tools?

LevelSignatureCriteria to meet
0 · HandcraftedNone: results are copied by hand from one tool to another.Starting point: no criteria.
1 · Locally tooledManual exports (file, screenshot) to other tools.
  • Results can be exported in common formats.
2 · SharedScheduled exports and sharing links.
  • Scheduled exports or mailings exist.
  • A report or a view can be shared through a direct link.
3 · IndustrializedDocumented interfaces: standard connectors, API, single sign-on.
  • An API or standard connectors are documented and versioned.
  • Single sign-on is in place.
  • We know which consumers call which interfaces.
4 · Integrated and governedEmbedded integration in business tools, with the user's context.
  • Views of the product are embedded in business applications.
  • The context (user, business object) is passed to the embedded view.
  • The user's rights are enforced in the embedded view.
5 · AutonomousTwo-way, event-driven integration: the product triggers actions and reacts to events.
  • The product reacts to events emitted by other systems.
  • An action decided in the product is carried out in the business system (write-back, trigger).
  • Exchanges are monitored and replayable.
Effect on the user

The user no longer has to export or re-enter anything: the result arrives where they work.

Business process#

To what extent does the product support the decision and action process?

LevelSignatureCriteria to meet
0 · HandcraftedInformal use: decisions are made elsewhere, with no trace.Starting point: no criteria.
1 · Locally tooledDecisions made from dashboards are noted by hand.
  • Important decisions made from the product are recorded, even outside the tool.
2 · SharedProcesses described: we know who decides what from which indicator.
  • The usage process (who, when, for which decision) is described.
  • Each key indicator has an owner.
3 · IndustrializedSimple workflows in the tool: thresholds, alerts, approvals.
  • Threshold alerts are configured.
  • An approval workflow exists in the product for at least one process.
  • Triggered actions are traced.
4 · Integrated and governedWorkflows customizable by business line, role or group.
  • Workflows are configured without development.
  • They vary by role or scope.
  • Deviations and processing delays are measured.
5 · AutonomousBusiness processes automated end to end, with human supervision by exception.
  • Common cases are handled without intervention.
  • Exceptions are escalated to the right person with their context.
  • Automatic rules are versioned, tested and auditable.
Effect on the user

The user handles only exceptions and decisions: the routine is taken care of.